Container Systems
20 ft Office Container
20 ft Office Container is an available configuration framework for early project comparison. Final dimensions, layout and specification are confirmed during quotation.
Indicative configuration — final engineering and specification confirmed during quotation.
Compact project office space within a configurable container system.
This model concept organises a practical starting point for compact project office space. It is not a certified final product; site conditions, local requirements and the approved project brief govern technical development.
Model details
Explore the details you need.
Open a section to view its information.
Dimensions & technical specification
| Transport dimensions | Confirmed with the project loading plan |
|---|
| Configuration | Indicative catalogue framework |
|---|---|
| Intended use | Compact project office space |
| Structural system | Modular frame; final member schedule project-specific |
|---|---|
| External envelope | Configuration dependent; confirmed during technical development |
| Insulation | Selected for climate, use and local requirements |
| Internal finishes | Optional specification packages |
|---|---|
| Electrical preparation | Project-specific and subject to local requirements |
| Plumbing preparation | Provided where required; final scope confirmed during quotation |
Standard features & options
Standard features
- Coordinated structural shell — Developed to the selected system and project brief.
- Prepared door and window openings
- Service routes prepared for project coordination
Optional features
- Alternative internal and external finish packages
- Project-specific electrical and plumbing preparation
- Climate-responsive envelope options — Subject to technical development and local requirements.
Transport & installation
Transport
Flat-pack or assembled transport can be considered according to the selected configuration and route.
| Transport approach | Flat-pack or assembled transport can be considered according to the selected configuration and route. |
|---|---|
| Loading plan | Final loading plan confirmed with the quotation. |
| Lifting | Suitable lifting equipment and an approved lifting approach may be required. |
| Packaging | Protection and packaging are selected for the transport method. |
| Unloading | Local unloading arrangements and responsibility are confirmed before dispatch. |
Installation
Units are positioned or assembled on prepared supports, then weathered and connected.
| Foundation readiness | Foundation type, tolerances and readiness are confirmed by project-specific engineering. |
|---|---|
| Site access | Safe delivery access, working space and unloading zones must be prepared. |
| Assembly method | Assembly method depends on flat-pack or assembled delivery. |
| Labour & supervision | Local labour and specialist supervision requirements are defined during project planning. |
| Utility connections | Final utility connections remain a site responsibility unless included in the quotation. |
| Completion checks | Weather protection, connections and completion checks are coordinated before handover; scope is project-specific. |
Drawings & documents
Model drawings and technical documents are being prepared. Contact our team to discuss the information needed for your project.
Ask About This Model →Is OM-C20-OF right for your project?
Share your location and intended use. We’ll discuss the next steps together.