Panelised Buildings
36 m² Panelised Office
36 m² Panelised Office is an available configuration framework for early project comparison. Final dimensions, layout and specification are confirmed during quotation.
Indicative configuration — final engineering and specification confirmed during quotation.
Small project or administrative office within a configurable panelised system.
This model concept organises a practical starting point for small project or administrative office. It is not a certified final product; site conditions, local requirements and the approved project brief govern technical development.
Model details
Explore the details you need.
Open a section to view its information.
Dimensions & technical specification
| Gross floor area | 36 m² |
|---|---|
| Transport dimensions | Confirmed with the project loading plan |
| Configuration | Indicative catalogue framework |
|---|---|
| Intended use | Small project or administrative office |
| Structural system | Repeatable panel and connection system; configuration dependent |
|---|---|
| External envelope | Configuration dependent; confirmed during technical development |
| Insulation | Selected for climate, use and local requirements |
| Internal finishes | Optional specification packages |
|---|---|
| Electrical preparation | Project-specific and subject to local requirements |
| Plumbing preparation | Provided where required; final scope confirmed during quotation |
Standard features & options
Standard features
- Coordinated structural shell — Developed to the selected system and project brief.
- Prepared door and window openings
- Service routes prepared for project coordination
Optional features
- Alternative internal and external finish packages
- Project-specific electrical and plumbing preparation
- Climate-responsive envelope options — Subject to technical development and local requirements.
Transport & installation
Transport
Panels and components are organised as sequenced transport bundles.
| Transport approach | Panels and components are organised as sequenced transport bundles. |
|---|---|
| Loading plan | Bundle quantities and vehicle loading depend on the project configuration. |
| Lifting | Mechanical handling may be required for unloading and panel erection. |
| Packaging | Bundles receive project-appropriate restraint and weather protection. |
| Unloading | A prepared unloading zone and local handling plan are required. |
Installation
Panels are erected in a planned sequence on a prepared base.
| Foundation readiness | Foundation type, tolerances and readiness are confirmed by project-specific engineering. |
|---|---|
| Site access | Safe delivery access, working space and unloading zones must be prepared. |
| Assembly method | Numbered panels and components follow the agreed erection sequence. |
| Labour & supervision | Local labour and specialist supervision requirements are defined during project planning. |
| Utility connections | Final utility connections remain a site responsibility unless included in the quotation. |
| Completion checks | Weather protection, connections and completion checks are coordinated before handover; scope is project-specific. |
Drawings & documents
Model drawings and technical documents are being prepared. Contact our team to discuss the information needed for your project.