
Container Systems
Rapidly deployable modular spaces for site facilities, accommodation, offices, sanitary buildings, security units and small technical facilities.
Explore systemGate control and monitored access
Guard, gate-control and small office configurations planned around visibility, access and protected equipment space.
Layout, engineering and specification are confirmed for your project.

Security facilities may support gate control, visitor processing, monitoring and small administrative functions. Position, sightlines, access-control equipment and sanitary support are project-led; no ballistic or security certification is implied.
Typical requirements
Building systems
Selection depends on your location, scale and delivery needs.

Rapidly deployable modular spaces for site facilities, accommodation, offices, sanitary buildings, security units and small technical facilities.
Explore system20 ft Office Container is an available configuration framework for early project comparison. Final dimensions, layout and specification are confirmed during quotation.
Explore Model →Planning details
Compact Guard Cabin provides a representative planning framework for single-point access monitoring.
single-point access monitoring
Container Systems
The concept can be adapted to the verified gate geometry and equipment brief.
Planning framework only. Final spaces, quantities, layout and specification are adapted during quotation.
Discuss this configurationGate Control Office provides a representative planning framework for managed personnel and vehicle entry.
managed personnel and vehicle entry
Container Systems
Additional lanes or functions require a wider site-security and traffic review.
Planning framework only. Final spaces, quantities, layout and specification are adapted during quotation.
Discuss this configurationObservation and access control.
Controlled registration and waiting.
Data and control hardware.
Staff welfare where required.
Project teams: Construction contractors, camp operators, industrial operators, facility managers
Position openings and workstations against the verified gate and boundary plan.
Separate safe pedestrian processing from barrier and vehicle movements.
Power, data, containment and protected equipment space depend on the selected system.
Confirm visibility, setbacks, barriers and vehicle geometry.
Project teams must define lighting, bollards, fencing and any specialist security measures.
Coordinate connection and backup responsibility with the operator.
Orientation, shading and glazing should maintain usable visibility.
Openings, hardware and coatings require location-specific review.
Tell us which drawings and technical information your project team needs. Availability and project-specific requirements will be discussed with our team.
Browse Technical Guidance →Start with your country and building use. We can discuss the details together.