OM-C20-AC

Container Systems

20 ft Accommodation Container

20 ft Accommodation Container is an available configuration framework for early project comparison. Final dimensions, layout and specification are confirmed during quotation.

Indicative configuration — final engineering and specification confirmed during quotation.

Single-module staff accommodation within a configurable container system.

This model concept organises a practical starting point for single-module staff accommodation. It is not a certified final product; site conditions, local requirements and the approved project brief govern technical development.

Model details

Explore the details you need.

Open a section to view its information.

Dimensions & technical specification
Indicative dimensions
Transport dimensionsConfirmed with the project loading plan
General
ConfigurationIndicative catalogue framework
Intended useSingle-module staff accommodation
Structure & envelope
Structural systemModular frame; final member schedule project-specific
External envelopeConfiguration dependent; confirmed during technical development
InsulationSelected for climate, use and local requirements
Finishes & services preparation
Internal finishesOptional specification packages
Electrical preparationProject-specific and subject to local requirements
Plumbing preparationProvided where required; final scope confirmed during quotation
Standard features & options

Standard features

  • Coordinated structural shell — Developed to the selected system and project brief.
  • Prepared door and window openings
  • Service routes prepared for project coordination

Optional features

  • Alternative internal and external finish packages
  • Project-specific electrical and plumbing preparation
  • Climate-responsive envelope options — Subject to technical development and local requirements.
Transport & installation

Transport

Flat-pack or assembled transport can be considered according to the selected configuration and route.

Transport planning
Transport approachFlat-pack or assembled transport can be considered according to the selected configuration and route.
Loading planFinal loading plan confirmed with the quotation.
LiftingSuitable lifting equipment and an approved lifting approach may be required.
PackagingProtection and packaging are selected for the transport method.
UnloadingLocal unloading arrangements and responsibility are confirmed before dispatch.

Installation

Units are positioned or assembled on prepared supports, then weathered and connected.

Installation planning
Foundation readinessFoundation type, tolerances and readiness are confirmed by project-specific engineering.
Site accessSafe delivery access, working space and unloading zones must be prepared.
Assembly methodAssembly method depends on flat-pack or assembled delivery.
Labour & supervisionLocal labour and specialist supervision requirements are defined during project planning.
Utility connectionsFinal utility connections remain a site responsibility unless included in the quotation.
Completion checksWeather protection, connections and completion checks are coordinated before handover; scope is project-specific.
Drawings & documents

Model drawings and technical documents are being prepared. Contact our team to discuss the information needed for your project.

Ask About This Model →

Is OM-C20-AC right for your project?

Share your location and intended use. We’ll discuss the next steps together.

Discuss Your Project