Logistics and transport
Design the movement before the dispatch.
Port-linked entry review
The Port of Mombasa is a major regional gateway; final entry port, customs route and freight responsibility must be selected for the project.
Urban and remote access
Verify road geometry, surface condition, bridge or route limitations, turning and unloading at the actual site.
Staged delivery
Sequence units, panels and equipment around available storage, lifting zones and safe installation fronts.
Freight responsibility
Define the responsibility split between supplier, freight agent, importer and local contractor before quotation.
Final transport planning requires route, port, customs, lifting and site-access confirmation.
Climate and environment
Specify for the verified location.
Regional climate differences
Highland, warm inland and coastal locations require different envelope, ventilation and services reviews.
Rainfall and drainage
Coordinate roof water, finished levels, site drainage and protected circulation against location-specific information.
Marine exposure
Projects near the coast require a project-specific corrosion and maintenance review; no corrosion class is implied.
Solar exposure and ventilation
Review orientation, shading, heat gain and natural or mechanical ventilation against occupancy and location.
Final envelope, structural and services specifications must be reviewed against project location, local standards and owner requirements.