APP-07 / Wet-area services and maintenance access

Sanitary Facilities

WC, shower, changing and accessible-facility concepts coordinated with water, waste, ventilation and maintenance.

Application position

A solution shaped around use.

Sanitary buildings are driven by fixture mix, user groups, privacy, accessibility, water supply, wastewater and cleaning access. Wet-area finishes and service preparation remain project-specific and subject to local requirements.

Primary audiences
Construction contractors / camp operators / project developers / government suppliers
Recommended systems
Container Systems / Panelised Buildings
Content status
Configuration framework; engineering required

Typical project needs

Requirements to resolve early.

  1. 01WC, shower and changing layouts
  2. 02Accessible provision and user separation
  3. 03Reliable water, waste, ventilation and maintenance access

Recommended systems

Construction approaches to review.

Suitability depends on scale, location, transport, expected use and the approved project brief.

SYS-01

Container Systems

Rapidly deployable modular spaces for site facilities, accommodation, offices, sanitary buildings, security units and small technical facilities.

Explore system
SYS-02

Panelised Buildings

Economical buildings shipped as repeatable panels and components for classrooms, clinics, offices, housing, dining and small institutional facilities.

Explore system

Relevant product families

CF-04

Sanitary Container Units

Configurable wet-area units with project-specific plumbing and finish schedules.

PF-06

Panelised Sanitary Buildings

Panelised washroom and sanitary blocks with configurable service zones.

Representative models

Catalogue starting points for sanitary facilities.

Model records are linked, not duplicated. Final suitability is confirmed during quotation.

OM-C20-SNConfiguration framework
Container Systems

20 ft Sanitary Container

20 ft Sanitary Container is an available configuration framework for early project comparison. Final dimensions, layout and specification are confirmed during quotation.

Indicative area
Final dimensions project-specific
Capacity
Fixture schedule project-specific

Indicative configuration — final engineering and specification confirmed during quotation.

View OM-C20-SN

Configuration packages

Representative combinations, not fixed bills of quantities.

Each package brings spaces, systems and models together as a commercial planning framework.

medium / Indicative package

Sanitary and Changing Block

Sanitary and Changing Block provides a representative planning framework for workforce welfare.

Intended scenario

workforce welfare

Included functions
  • WC zones
  • Showers
  • Changing area
  • Accessible facility
  • Service access
Recommended systems

Container Systems / Panelised Buildings

Expansion logic

Additional wet-area zones require confirmed water and wastewater capacity.

Planning framework only. Final spaces, quantities, layout and specification are adapted during quotation.

Discuss this configuration
small / Indicative package

Compact Sanitary Unit

Compact Sanitary Unit provides a representative planning framework for site or guard-support use.

Intended scenario

site or guard-support use

Included functions
  • WC provision
  • Hand-wash area
  • Service cupboard
Recommended systems

Container Systems

Expansion logic

Units may be repeated only after utility, maintenance and user-flow review.

Planning framework only. Final spaces, quantities, layout and specification are adapted during quotation.

Discuss this configuration

Typical spaces and functions

Programme elements to coordinate.

Function

WC zones

Project-selected toilet provision.

Function

Shower zones

Wash facilities with privacy.

Function

Changing area

Dry and wet transition.

Function

Accessible facility

Provision subject to applicable requirements.

Planning considerations

Questions before layout approval.

sanitation

Fixture and user strategy

Define user groups, privacy, accessibility and peak demand without assuming fixed capacity.

utilities

Water and wastewater

Confirm supply, storage, pressure, discharge and treatment responsibility.

maintenance

Cleaning and maintenance

Provide safe service access, durable project-selected finishes and drainage review.

Site and climate

Location changes the technical response.

  1. 01
    before delivery

    Connection points

    Set out verified water, waste and power interfaces before delivery.

  2. 02
    before use

    External drainage

    Coordinate surface water, wastewater and finished levels.

  3. 03
    before use

    Maintenance access

    Keep service zones accessible without crossing private user areas where practical.

Climate and environmental considerations

hot humid

Humidity and ventilation

Ventilation and condensation control depend on use frequency and local conditions.

cold night

Cold-night conditions

Water services and user comfort require location-specific review.

Delivery planning

Transport and installation decisions.

Transport considerations

Route, loading and handling

  • Protect fixtures, membranes and finish components in transport.
  • Connection interfaces and lifting approach depend on delivery format.
Installation considerations

Prepared site and coordinated scope

  • Pressure, drainage and waterproofing checks must follow the agreed technical scope.
  • Do not conceal service interfaces before project checks are completed.

Illustrative media

Conceptual layouts, not completed projects.

Sanitary Facilities functional zoningIllustrative planning placeholder; final layout follows the approved project brief.
Sanitary Facilities expansion logicConceptual growth sequence without fixed quantities or programme commitments.

Application documents

Safe quotation-stage document states.

application overviewSanitary Facilities Application OverviewIn preparation
INFO
planning checklistSanitary Facilities Planning ChecklistAvailable during quotation
INFO
quote checklistQuote Preparation ChecklistRequest document
INFO

Related applications

Connected operational requirements.

APP-01 / Camps and accommodation

Worker Camps

Configurable accommodation, welfare and operational zones for remote or temporary workforce projects.

  • Separation of living, service and operational zones
  • Phased expansion without disrupting occupied areas

SystemsContainer Systems / Panelised Buildings / Light Steel Buildings

Explore Worker Camps
APP-02 / Construction and industrial

Construction Site Facilities

Site offices, meeting, welfare, storage, sanitary and guard functions organised for active construction projects.

  • Fast mobilisation of office and welfare functions
  • Relocatable or repeatable deployment

SystemsContainer Systems / Panelised Buildings / Light Steel Buildings

Explore Construction Site Facilities
APP-04 / Camps and accommodation

Staff Accommodation

Room arrangements and shared support spaces developed around occupancy, privacy, sanitation and daily operations.

  • Clear occupancy and privacy strategy
  • Shared or private sanitary provision

SystemsContainer Systems / Panelised Buildings / Light Steel Buildings

Explore Staff Accommodation
APP-05 / Social and institutional

Classrooms

Teaching environments planned around circulation, lighting, ventilation, storage, sanitation and phased growth.

  • Flexible teaching and teacher zones
  • Safe student circulation and sanitary support

SystemsPanelised Buildings / Light Steel Buildings

Explore Classrooms

Quotation pathway

Define the sanitary facilities requirement.

Prepare the country, site, functions, approximate occupancy, access, utilities, target schedule, local responsibilities and applicable standards for technical and commercial review.